Ramsgate all Change     |     Click here to buy the book or look at our other books about Ramsgate and the surrounding area.
Ramsgate all Change   |   Viaduct   |   Title 4

Viaduct
BUILDING THE RAILWAY VIADUCT OVER MARGATE ROAD
In sinking the foundations of the piers of the viaduct across the Margate Road, in four out of the five, the engineers discovered after they had commenced that they were faced with problems. In the case of the first pier, they had not gone down far when to their amazement they discovered a disused chalk pit, which at some remote date had been loosely filled with ashes and rubbish and forgotten. That had to be cleared out and properly filled. On the next pier they discovered a relic of the First World War, a huge dug-out. That had to be explored and filled. Next, an old sewer, which they had to bridge, and when they imagined their difficulties overcome, they dug down to a water main, which also had to be bridged.